| TIID | 44534211 |
| Organisation Name | Gurugram Metropolitan Development Authority |
| Tender Brief | Corrigendum : Designing, Constructing, Testing, Commissioning, Operation And Maintenance Forraw Water And Clear Water Pumping Machinery, Mechanical Dewatering Of Sludge, Pre And Post Chlorination, Lowering Of Sub Soil Water Table, Transformer, Scada, And All Othe - Designing, Constructing, Testing, Commissioning, Operation And Maintenance For 5 Years After 12 Months Defect Liability Period For Construction Of Units Under Phase – Vi At Existing Water Works Chandu Budhera Comprising Of 1 Unit Of 100 Mld Automated Water Treatment Plant, Clear Water Reservoir For 100 Mld, Raw Water And Clear Water Pumping Machinery, Mechanical Dewatering Of Sludge, Pre And Post Chlorination, Lowering Of Sub Soil Water Table, Transformer, Scada, And All Other Works Contingent There To.. |
| Last Date For Submission | 22nd Apr, 2026 |
| Opening Date | 23 Apr, 2026 |
| Document Cost | 5000.00 |
| EMD | 10800000.00 |
| Estimated Cost | 539999839.00 |
| City | Gurgaon |
| State | Haryana |
Delhi, Delhi, India
Corrigendum : Ie Services For Construction Of 6-lane Greenfield Highway Starting From Its Junction With Nh-4b (new Nh-348) Near Pagote (km.0.000) Till Its Junction On Nh-48 At Chowk (km.29.219) In Maharashtra To Be Executed On Bot (toll) Mode Under Nh (o)
Margao, Goa, India
Corrigendum : Supply Installation Commissioning Maintenance Of Sensors Data Acquisition Data Transmission Analysis Management Reporting For The Same For Bhms For New Cable Stayed Zuari Bridge, Old Zuari Bridge On Nh-66 And Borim Bridge On Nh-566 In State Of Goa
Delhi, Delhi, India
Corrigendum : Independent Engineer Services For Construction Of Strr (west Side) Nh948a Kunigal (ramanagara Taluk) To S. Mudugadapalli (hosur Taluk) From Km 79 To Km 144.25/144.00 (design Chainage) Phase-ii In Karnataka On Ham (project Length 65.25 Kms)
Delhi, Delhi, India
Corrigendum : Independent Engineer Services For Construction Of Strr (west Side) Nh948a Obalapura (nelamangala Taluk)) To Kunigal (ramanagara Taluk) From Km 0 To Km 79 (design Chainage) Phase-i In Karnataka On Ham (project Length 79 Kms)
Ending Today
Get your quote now and avail the chance to enter first 5 lucky customer with extra 20% discount
© Tender Infotech. All Rights Reserved. Designed by Tender Infotech